Saturday, June the 13th – 11:00 – Almerimar / Spain

The trip to Almerimar from Bemalmadena was good sailing. We left at about 12:00 midday and arrived at 01:00 after midnight. A constant F5 – F6 was pushing from SW and we managed 90NM in 13 hours! Then, at midnight and about 5 NM off the harbour of Almerimar in a gybing maneuver it happened. The outhaul line clamp came off and all the force was applied to the little openings for the reefing lines at the foot of the sail. The cloth is quite thin there and it teared off. The sailmaker in Almerimar is of course not available but fortunately, since this part of the sail is not exposed to strong forces, it should be possible to go on as long as the outhaul line is stretched properly. I visited Spence’s chandlery shop yesterday and they have been very professional and helpful with the Raymarine wind instrument issue. The Cable in the mast was replaced and the wind sensor is arriving today. Both parts were showing corrosion because of a leakage in the joint. I was told that this is often a problem with these wind sensors. Let’s hope that the sensor will arrive and be installed today.

20150613 on the way to Almerimar
Heading east at 7 to 8 knots

20150613 on the way to Almerimar Dolphins
Dolphins in the Mediterranean are smaller

20150613 Almerimar
Moored in Almerimar

20150613 Tear
Tear in main sail

Leave a Reply

Your email address will not be published.